Dolores Canyon Solar

The Dolores Canyon Solar project, located in Dolores, CO, was developed and constructed by JUWI inc., purchased by Tri-State Generation and Transmission Association (TSGT), and provides power to TSGT. The project will generate enough electricity to power 32,802 homes, and is expected to reach commercial operation in 2025.

Dolores Canyon Solar
Dolores County, CO
The Dolores Canyon Solar project, located in Dolores, CO, was developed and constructed by JUWI inc., purchased by Tri-State Generation and Transmission Association (TSGT), and provides power to TSGT. The project will generate enough electricity to power 32,802 homes, and is expected to reach commercial operation in 2025.
MWdc 145
number of modules 32,802
Number of Modules 32,802
number of modules 32,802
Project Status Under Construction